Minor problems with the chute. I don't think it's suppose to do that.
Still a stretch to run the concrete to the end of the form.
10 yards later, most of the Master Bedroom area is done.
20 yards later, after truck #2.
You've got truck #3 at bat and truck #4 on deck.
Everything's setting up nicely.
50 yards in... only 4 yards left to go.
This machine levels everything out and gives a uniform smooth finish.
Here the contractor is pulling off some of the braces used to support the forms.
And the irrigation is in.
(Water participates in the hydration reaction as concrete cures. This makes for a stronger foundation.
Back to ------->Johnson Residence